
Tailings Storage Facilities Management: From data acquisition to an integrated 3D model in Leapfrog
The workflow solution that is helping safeguard operations with digital twin technology. Environmental, socio-economic and political risks along with a need to digitally transform the mining industry, has put Tailings Storage

Watch Iceland’s new volcano form in Leapfrog
Energy leaders need agile subsurface tools to better operate in a turbulent environment and build future growth.

The role of the 3D Geological Model in Geotechnical BIM
Building Information Modelling/Management (BIM) is defined as ‘Use of a shared digital representation of a built asset to facilitate design, construction and operation processes to

SIGMA/W Field Stresses
This webinar demonstrates a practical example using the Field Stresses feature in SIGMA/W, as well as some practical tips for simulating initial stress in the

‘Why I use the Contaminants extension for Leapfrog Works’ with Eryn Torres at Geosyntec consultants
who will explain why she is using the Contaminants extension in her daily workflows, the variety of projects and range of applications she uses it

BUILD3D: Exporting results for better interpretation and visualization
One of the exciting new features first launched in GeoStudio 2021 R2 is the ability to export results data from SEEP3D and TEMP3D analyses created

How Mawson Resources uncovered Finland’s gold-cobalt riches with data
Water drips from a diamond drill core as it defrosts indoors. Winter is the only season that heavy equipment can make it across Finland’s marshy

How Equinox Gold keeps drill data clean across three countries
“MX Deposit is light. There's not some heavy program sitting somewhere. You’ve got a tablet? You’ve got a laptop? You're good to go from anywhere,”