Freezing Analysis of a Buried Pipeline
Introduction Excessive frost heave or settlements are major design and operational issues for hydrocarbon pipelines in permafrost regions. A chilled gas pipeline may lead to
Probabilistic – James Bay Case History
Introduction Landslide risk assessment and management is a common aspect of the geotechnical engineering profession. One key aspect of the risk assessment process is to
Managing the Data Risk Associated with 24 Active Drill Rigs
Managing the Data Risk Associated with 24 Active Drill Rigs Alexandria Marcotte - Osisko Mining
From Complexity to Clarity to Imagination Reimagining Numerical Analyses in Mining
From Complexity to Clarity to Imagination Reimagining Numerical Analyses in Mining Lee Barbour
Part 2: Viewing Warnings and Keeping Your Duplicates in Leapfrog Geo
The topics in this post were originally presented at the Seequent Lyceum 2019 in Vancouver by Project Geologist, Anna Kutkiewicz. This is part 2 of
Application of 3D Photogrammetry from Mapping to Modelling
Application of 3D Photogrammetry from Mapping to Modelling of the Fenelon Gold Underground Bulk Sample. Christopher Kelly - Wallbridge
Red Chris Copper Porphyry Revisited A New Look at Old Data
Red Chris Copper Porphyry Revisited A New Look at Old Data Sarah Devriese - Condor Consulting
Modeling Early Stage Exploration Targets to Evaluate Potential and Mitigate Risk
Modeling Early Stage Exploration Targets to Evaluate Potential and Mitigate Risk The Wishbone VMS Target in NW Ontario Liane Boyer - Broken Rock Resources